Customization: | Available |
---|---|
After-sales Service: | Respond Within 48 Hours |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1, Introduction of the System
1) Paper Supply System | It has the exact paper connection device and the high defination automatic alignment device, moreover, the automatic making device is very important to the edge trimming and shaping and insures the appearance of the gypsum board. |
2) Forming System | The vertical mixer and the pneumatic forming device are made of the special wearable stainless steel which enhance the system's wearable ability and prolong the life span of the gypsum board production line. |
3)Conveying System | This system adds the wasted board remoral device which reduces the workers' labor intensity and ensures the clearness of the workshop. |
4) Dry System | The drying system is the core of the whole production line and it has the direct effort on the quality and energy consumption of the products. In the dryer, the heat exchange and the dry hot air is blowed into each distributor to adjust the temperature of each layer and seperate temperature zone freely. Thus it guarantee the quality of the gypsum board. |
5) Heating system |
Most of this system uses the organic thermal carrier boiler (thermal oil boiler) in the gypsum board industry.The thermal oil boiler is a kind of normal pressure and high temperature heating equipment with the main fuel of coal,oil and gas. It takes the thermal oil as the carrier and is carrier into the dryer by the induced draft fan, so that it can fully make use of the heat energy and reduce the cost of the products. |
6)Electric Control System | All of the three aspects adopt the PLC control system.AC container and drive and it also uses the contactless equipments such as frequency convertor and realize the long-term and continuous running of the full automatic gypsum production line. |
2. The certification of ISO and CE
3. Professional Installation in the Customer's Plant
4.The machine and service
1) The machine guarantee is 5 years except the easy worn parts such as bearings, electric buttons.
2) Machine delivering time: 2 to 5 months after the deposit.
3) Payment terms: T/T or LC
4) Machine installation and commission: 2 to 4 months when the buyer prepare the installation and commission conditions.
5) We offer engineer train the buyers' workers to operate the machine and after you master the machine then pay us the installation and commission payment.
6) In order to guarantee the machine running each year. we will send engineer to check and development the technology with the buyer.
7) If the buyer can not run the machine well. We will send the prouction engineers to help the buyer to run the machine and we can operate for long terms.
Hebei LVJOE Machinery Manufacturing (group) Co.,Ltd was established in 1998, it's a diversified development enterprises with researching, designing, manufacturing, international trade, project equipment integration.
Paper faced gypsum board production line is one of our main product in the global market. More than 100 projects are well installed and running up to now!
Automatic process, high quality, long-term service are our advantages compared with other products!