Hebei Lvjoe Machinery Manufacturing Co., Ltd. is professional in designing and manufacturing all kinds of industrial equipments. In the last few years, we have successfully developed many kinds of industrial equipments. Pls find our products as belows:
1. Mineral wool ceiling board production line;
2. Gypsum powder production line;
3. Gypsum block production line;
4. Gypsum board lamination machine;
5. Gypsum board production line;
Hebei Lvjoe Machinery Manufacturing Group Co., Ltd. was founded in 1998, which is a diversified development enterprise integrating R&D, design, production, international trade and engineering equipment. We are a strong unit with comprehensive strength in the national gypsum equipment industry.
Introduction to the main systems
1.Forming section |
Forming section includes paper (face and bottom paper) treatment systems and vertical mixer, forming platform, molding machines and other equipment. Paper handling system is mainly composed of automatic splicer (lift, uncoiling device, stock paper machine), pull device, adjusting device, tensioning device, automatic correction system, indentation device, ink jet printing devices and other components. Following the above The wet board section That wet plate solidification and transport section. Wet strip on the 1 # 2 # solidified conveyor belt gradually solidified. 1 # solidified belt with Pull on a pneumatic device , be used for Pull the head of gypsum board belt in the production starts. Then through after a series of treatment such as spray, leveling, treating edge to become the finalize wet gypsum belt, and a and the water evaporated during solidification. After entering the back of the conveyor roller, wet start-sided strip evaporate moisture. After the initial solidification wet strip roll into the biaxial rotary knife cutting machine, double servo motor independently controlled by the upper and lower rollers for high precision cutting knife. After cutting wet plate accelerated by accelerating roller group entered into 1 # lateral plate roller. Plate Group 1 # transverse cross conveyor machine translated be face up after the overturn, the two raw board into the distribution of dryer through outlet roller two double |
2.Dry section |
The distribution machine for two belt conveyor type, can reduce the extent of the wet plate bent during transport, thereby reducing the rejection rate. Meanwhile, the distribution machine also has a board group "close" function. Drying machine for direct combustion in the form of natural gas, the use of the most advanced "Eclipse " (or other imported products) gas burners, not only reduces the thermal heat loss, but also effectively and accurately adjust the air temperature, and fully guarantee the dryer work regime. Input board section of the dryer with the "chase board" function, so that a gap between the front and rear board set to minimize, to ensure the dry mass of the dryer. Doors and roof, floor design of the dryer has a "hot off the bridge" structure. At the same time the door seal with a special material and structure of import and export between the dryer and the District has "stainless steel curtain" so that heat loss is minimized throughout the dryer. The dryer also has a special "burnt edges to prevent board structure," wet exhaust gas introduced soon partially cooled mezzanine curtain and door, not only to cool the plate edges, but also increased the humidity, thus effectively preventing the board edge over-burning phenomenon. The drying machine is also provided with heat recovery system, the heat of the exhaust gas discharged through the fresh air heat exchanger, the hot air into the dryer new departments, to further reduce heat loss. The trigger(outlet boar machine) for the "12 pieces to be one" structure. The upper 11 floors oblique rollers gypsum board eventually enter by the bottom level belt conveyor discharge.That dry plate process section. gypsum board from Discharged from the drying section of a double row rough belt conveyor laterally into the # 2, and then enter booker through the conveyor machine. If dry waste board or long board then straight into the dry waste plate roller. Double row gypsum board machine in the synthesis of a group of co-plates after entering 3 # laterally, when the downstream equipment failure will board on the cross conveyor roller into the selection of films, edging into the cutting machine when the downstream device is normal and fine-cut Hemming. After the board by edging stack (two boards a stack) into the reservoir plate machine, reservoir into four stacked eight push into the finished belt. When be pack (4 stock for 8 pieces ) enter to to the finished board stock, the chain conveyor drop, When the belt machine down, the 4 stack was put into the chain plate conveyor by forklift. The chain plate machine down a height after bidirectional alignment,then go into another round of cycle.When arriving the stack's height,the chain plate convey the stack to the output roller.At the same time,the input roller is put into a waste plate or wood frame.Then the chain plate lifts up fast to welcome next stack.Single stack's advantage is that it can directly connected with the automatic packaging line after the stack output roller.In this way, it can greatly reduce the operating personnel and the working strength,improve the work efficiency and automation level. Meanwhile,You can store it by stack after using the forklift to fork.It has high flexibility of operation. |
1) The machine guarantee is 5 years except the easy worn parts such as bearings, electric buttons.
2) Machine delivering time: 2 to 5 months after the deposit.
3) Payment terms: T/T or LC
4) Machine installation and commission: 2 to 4 months when the buyer prepare the installation and commission conditions.
5) We offer engineer train the buyers' workers to operate the machine and after you master the machine then pay us the installation and commission payment.
6) In order to guarantee the machine running each year. we will send engineer to check and development the technology with the buyer.
7) If the buyer can not run the machine well. We will send the prouction engineers to help the buyer to run the machine and we can operate for long terms.
What information do you need to make the quotation?
The output per year, the type of the heat source, better with the gypsum ore test report. The more information we get, the suitable of the project will be. It's simple and just tell me what you want to do, we'll make it for you.
Can you calculate the daily running cost for the project?
Certainly, we'll support the daily or yearly raw material cost including the dry additives, water, natural gas, etc., to you for free, if you need it.
How's the quality control of your factory?
We have our own QA/QC team controlling all process and product. We also have our own gypsum lab in factory to research new technology and test new design product.
What's the after-sale service?
We'll take in charge of the installation and debugging when the product arrive your site. We will also supply 2-year-time wearing parts and spare parts for you. Solve any questions you meet.
Can you design the whole factory for us?
Yes, we not only supply the design and quotation for the production, but also the settle and wire of the whole factory.