• Fully Automated Gypsum Board Production Line
  • Fully Automated Gypsum Board Production Line
  • Fully Automated Gypsum Board Production Line
  • Fully Automated Gypsum Board Production Line
  • Fully Automated Gypsum Board Production Line
  • Fully Automated Gypsum Board Production Line

Fully Automated Gypsum Board Production Line

After-sales Service: Respond Within 48 Hours
Warranty: 2 Years
Certification: CE, ISO
Condition: New
Customized: Customized
Automatic Grade: Automatic
Customization:
Gold Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Our Advantages
  • Company Profile
Overview

Basic Info.

Model NO.
LVGB-10MHA
Structure
Horizontal
Transmission Method
Electric
Capacity
10.000.000 M2
Booker
No Waste Edges
Speed of Production Line
20m/Min
Workers
~14 Per Shift
Machines Area
170 X 35m
Installed Power
~750kw
Special Service
Overseas Operation Service
Mixer and Forming Machine
No Need Worker
Final Production
Meet Europe Standard
Dryer
Similar Europe Technology
Transport Package
Suitable for Transportation by Sea/Train
Specification
CE, SGS, BV
Trademark
LVJOE MACHINERY
Origin
Shijiazhuang, Hebei Province
HS Code
8474809010
Production Capacity
12 Sets/Year

Product Description

Product Description

1. raw materials consumption

    Raw materials consumption (1200 x 2400 x 9.5mm)
  item  consumption
 per sq.m. (kg/m2)
1 gypsum powder 6.00
2 paper  0.440
3  modified starch  0.092
4 foaming agent 0.0117
7 fiber glass 0.083
8 glue 0.0022
9 water 4.50
10  electricity  0.35kWh/ m2
11 gas ~4200Kcal/ m2

Note: please check calorific value of fuel with your supplier.
One photo of gypsum powder feeding and metering (belt conveyor)


After metering, gypsum powder, modified starch, water and others are put into screw mixer, where they are mixed. Then the mixture is continuously sent to the vertical mixer.
Foaming agent metered and stored in the tank. When use, it and water are filled into foaming generator. As compressed air vent in, foam is generated steadily, delivered into the vertical mixer too. 


Fully Automated Gypsum Board Production Line
 


2. mixer and forming section

The edge glue (packaged in tank) is delivered on the second floor at the top of forming table. 
Face paper and bottom paper are delivered to paper holders by hoist. Bottom paper goes through paper stretching, creasing, and positioning devices until sent to the forming table, where the slurry in the vertical mixer is extruded evenly on the surface of bottom paper. Face paper, on the other hand, also goes through stretching, creasing, and positioning, and is delivered to the forming table too.
Followed by vibrating, creasing of back paper, covering face paper and extrusion, the wet & soft gypsum board is formed, which is then to be conveyed by the belt for setting. As time passed, gypsum board has enough strength for being cutted in certain length, which shall be little longer than 2400mm. After that, it is sent to 1# conveyor (traverse conveyor). While defective gypsum board conveyed out of the production line by belt, the qualified gypsum board inverted and sent to next process. 


Fully Automated Gypsum Board Production Line


3. drying section

Gypsum boards are sent to 6 drying decks through tipple conveyor. Dryer adopts hot air (gas) oven for drying, which enables gypsum board to be dried by hot air. Finally the free water evaporated, and water content less than 1%. 

Fully Automated Gypsum Board Production Line
 

5 Project schedule

5.1 customer project information exchange
 
5.2 contract signing
 
5.3 initial designing
In this stage the following designing work would be done:
² Machine layout including facilities;
² Calculating result of all process, upon which further designing work would develop;
² Customer's audit, in which the buyer would further ask customer's opinion over that and then modify it in order to get a final proof from customer;
 
5.4 Sub contract signing and purchasing
² Sub contract with sub suppliers for production line machines and facility;
² Raw materials purchasing for machine building;
 
5.5 Machine building
² Parts machining;
² Machine assembling;
² Machine test running within factory;
 
5.6 Document delivery including
² Drawing of all the foundation works
² Those document that are necessary before installation work begins;
 
5.7 contracted machine delivery including:
² Customer pre acceptance inspection, to clarify the right machine of right quantity would be delivered; dividable delivery is possible and allowed;
² Machine packaging;
² Inland transportation in China;
² Sea shipment;
² Customer clearance or any formality that is required by Qatar local government;
² Inland transportation in Qatar;
² Cargo unloading and storage;
 
5.8 Production line installation
² Board line installation;
 
5.9 Training program execution
² Training for lab. Test of board plant;
² Machine understanding training;
² Machine operation training;
² Production training;
n Production operation;
n Production quality control;
² Training examination;
 
5.10 Commissioning including:
² Board line commissioning:
n Single machine commissioning;
n Whole line commissioning without materials;
n Whole line commissioning with materials;
 
5.11  Trial production including:
Trial production will star only when all training program have been fully executed.
² Board line trial production;
 
5.12 Project acceptance including:
² Board plant acceptance;

Fully Automated Gypsum Board Production Line

6 Project human resource

6.1 Project manager
The buyer and the seller will assign a project manager each side, whose responsibility is supervising the whole project process, to make coordination to ensure the project developing smoothly as scheduled.
 
6.2 Site manager
The buyer and the seller will assign a project manager each side, whose responsibility is supervising the whole project process on site, to make coordination to ensure the project develop smoothly as scheduled.
 
6.3 Engineers, technicians and labor

 
Human requirement for board plant erection
  installation commissioning
The seller supervisor 1 1
mechanical 6 6
electrical 1 1
total 8 8
The buyer supervisor 3 1
mechanical 24
Welder 5
8
electrical 6 2
total 33 11
 Fully Automated Gypsum Board Production Line

7 Spare parts with machine

Below is spare parts delivered together with machine of no additional charge:
 
Item  Spare part Number 
1 One set of spare parts for mixer 1 set
3 Saw of marking device(electroplating diamond grain) 4 pcs
4 knife to cut the board 1 pcs
5 Regular bearings 20 pcs
6 Anti-grinding bearings 20pcs
7 Chain gear 20pcs
8 Chain  10 pcs
9 Forming line rollers 6 pcs
10 Drying room rollers 6 pcs
11 Photo-electronic switch 5 pcs
12 AC contactor 4 pcs
13 Reducer 2 sets
14 Motor 1set
15 Catch 6pcs
16 Switch 20set
17 Fuse 20pcs
18 Indicator light 30pcs
19 Motor for paper alignment device 1 sets
20 Mixer spare parts 1 set
21 Mixer 1 set
22 Forming device 1 set
23 Spare parts for one and half year 1 set
 
Our Advantages


1 Our company has professional installation & commissioning teams, we will install and debug the production line at the customers' place until the equipment produces qualified products.

 

2 We supply spare parts all the year round. The guarantee of equipment is one year. 

 

3 We are responsible for the technical consultation and service all the year around and help to solve all kinds of technical problems at any time.

 

4 We will help customers do the consignment and the relevant procedure for import and export.

Fully Automated Gypsum Board Production Line

Company Profile

   Hebei LVJOE Machinery Manufacturing Co.,Ltd is a large manufcturer of integrted supply dedicated in researching,manufacturing,trading of building material machinery.We are HEBEI province municipal civilized and creditable unit,with high-tech enterprise certificate issued by the state,national patent licenses,CE quality system certification issued by the EU,and ISO9001 quality system certification.

  Our company was established in 1998, during these 20 years, We devoted to the designing and manufacturing of gypsum building material equipment all the time.
  With the development of technology and accumulation of experience, we got fairly deep basis on the gypsum building material equipment production ability, gypsum board equipment and gypsum powder equipment production, manufacturing ability.

Fully Automated Gypsum Board Production Line









 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
141
Year of Establishment
2006-01-04