Gypsum Board Plant, Gypsum Board Machine, Gypsum Board Device manufacturer / supplier in China, offering Gypsum Board Machinery 119th Canton Fair, Gypsum Powder Production Line, Gypsum Board Production Line and so on.

(/ )

Gypsum Board Machinery 119th Canton Fair

FOB Price: Get Latest Price
Min. Order: 1 Set
Production Capacity: 12 Sets/Year
Transport Package: Suitable for Transportation by Sea/Train
Payment Terms: L/C, T/T, Money Gram
Basic Info
  • Model NO.: LVGB-8MHA
  • Condition: New
  • Automatic Grade: Automatic
  • Transmission Method: Machinery
  • Booker: No Waste Edges
  • Workers: 14 Per Shift
  • Dosing System: Touch Screen
  • Mixer and Forming Machine: No Need Worker
  • Dryer: Same as Europe Technology
  • Specification: CE, SGS, BV
  • HS Code: 8474809010
  • Certification: CE, ISO, BV
  • Customized: Customized
  • Structure: Horizontal
  • PLC: Siemens S7 Series
  • Speed of Production Line: 20m/Min
  • Machines Area: 170 X 22m
  • Special Service: Help You to Operate and Train
  • Final Production: International Standard
  • Trademark: LVJOE MACHINERY
  • Origin: Shijiazhuang, Hebei Province
Product Description


Welcome to visit us in 119th Canton Fair (1.1K15, April 15 to 19)



1. raw materials consumption


    Raw materials consumption (1200 x 2400 x 9.5mm)

item consumption
 per sq.m. (kg/m2)
1gypsum powder6.00
2paper 0.440
3 modified starch 0.092
4foaming agent0.0117
7fiber glass0.083
8glue0.0022
9water4.50
10 electricity 0.35kWh/ m2
11gas~4200Kcal/ m2
Note: please check calorific value of fuel with your supplier.
One photo of gypsum powder feeding and metering (belt conveyor)

After metering, gypsum powder, modified starch, water and others are put into screw mixer, where they are mixed. Then the mixture is continuously sent to the vertical mixer.
Foaming agent metered and stored in the tank. When use, it and water are filled into foaming generator. As compressed air vent in, foam is generated steadily, delivered into the vertical mixer too. 

 
Gypsum Board Machinery 119th Canton Fair







2. mixer and forming section
The edge glue (packaged in tank) is delivered on the second floor at the top of forming table. 
Face paper and bottom paper are delivered to paper holders by hoist. Bottom paper goes through paper stretching, creasing, and positioning devices until sent to the forming table, where the slurry in the vertical mixer is extruded evenly on the surface of bottom paper. Face paper, on the other hand, also goes through stretching, creasing, and positioning, and is delivered to the forming table too. Followed by vibrating, creasing of back paper, covering face paper and extrusion, the wet & soft gypsum board is formed, which is then to be conveyed by the belt for setting. As time passed, gypsum board has enough strength for being cutted in certain length, which shall be little longer than 2400mm. After that, it is sent to 1# conveyor (traverse conveyor). While defective gypsum board conveyed out of the production line by belt, the qualified gypsum board inverted and sent to next process. 

Gypsum Board Machinery 119th Canton Fair







3. drying section
Gypsum boards are sent to 6 drying decks through tipple conveyor. Dryer adopts hot air (gas) oven for drying, which enables gypsum board to be dried by hot air. Finally the free water evaporated, and water content less than 1%. 

Gypsum Board Machinery 119th Canton Fair




 

5 Project schedule

5.1 customer project information exchange
 
5.2 contract signing
 
5.3 initial designing
In this stage the following designing work would be done:
² Machine layout including facilities;
² Calculating result of all process, upon which further designing work would develop;
² Customer's audit, in which the buyer would further ask customer's opinion over that and then modify it in order to get a final proof from customer;
 
5.4 Sub contract signing and purchasing
² Sub contract with sub suppliers for production line machines and facility;
² Raw materials purchasing for machine building;
 
5.5 Machine building
² Parts machining;
² Machine assembling;
² Machine test running within factory;
 
5.6 Document delivery including
² Drawing of all the foundation works
² Those document that are necessary before installation work begins;
 
5.7 contracted machine delivery including:
² Customer pre acceptance inspection, to clarify the right machine of right quantity would be delivered; dividable delivery is possible and allowed;
² Machine packaging;
² Inland transportation in China;
² Sea shipment;
² Customer clearance or any formality that is required by Qatar local government;
² Inland transportation in Qatar;
² Cargo unloading and storage;
 
5.8 Production line installation
² Board line installation;
 
5.9 Training program execution
² Training for lab. Test of board plant;
² Machine understanding training;
² Machine operation training;
² Production training;
Production operation;
Production quality control;
² Training examination;
 
5.10 Commissioning including:
² Board line commissioning:
Single machine commissioning;
Whole line commissioning without materials;
Whole line commissioning with materials;
 
5.11  Trial production including:
Trial production will star only when all training program have been fully executed.
² Board line trial production;
 
5.12 Project acceptance including:
² Board plant acceptance;
 

6 Project human resource

6.1 Project manager
The buyer and the seller will assign a project manager each side, whose responsibility is supervising the whole project process, to make coordination to ensure the project developing smoothly as scheduled.
 
6.2 Site manager
The buyer and the seller will assign a project manager each side, whose responsibility is supervising the whole project process on site, to make coordination to ensure the project develop smoothly as scheduled.
 
6.3 Engineers, technicians and labor
 
Human requirement for board plant erection

installationcommissioning
The sellersupervisor11
mechanical66
electrical11
total88
The buyersupervisor31
mechanical24
Welder 5
8
electrical62
total3311
 

7 Spare parts with machine

Below is spare parts delivered together with machine of no additional charge:
 
Item Spare partNumber 
1One set of spare parts for mixer1 set
3Saw of marking device(electroplating diamond grain)4 pcs
4knife to cut the board1 pcs
5Regular bearings20 pcs
6Anti-grinding bearings20pcs
7Chain gear20pcs
8Chain 10 pcs
9Forming line rollers6 pcs
10Drying room rollers6 pcs
11Photo-electronic switch5 pcs
12AC contactor4 pcs
13Reducer2 sets
14Motor1set
15Catch6pcs
16Switch20set
17Fuse20pcs
18Indicator light30pcs
19Motor for paper alignment device1 sets
20Mixer spare parts1 set
21Mixer1 set
22Forming device1 set
23Spare parts for one and half year1 set
 
Send your message to this supplier
Avatar
Ms. Lisa
sales manager
*From:
To: Ms. Lisa
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now